Val Trompia Tramway
The Brescia–Gardone Val Trompia tramway was an interurban tram line of the Brescia provincial network that connected the city of Brescia to the municipality of Gardone Val Trompia.
Between 1910 and 1934 it was extended to Tavernole sul Mella and is also known as the Val Trompia tramway.
History
In the late 1870s, several projects were proposed to the Provincial Deputation to connect Brescia to the industries of Val Trompia. Among the intentions of the provincial administration was to develop the existing arms and steel industries and to improve the flow of passengers to and from the city, and a tram seemed the most suitable infrastructure. Many projects were rejected because they did not correspond to the province's intentions.
The proposal of Engineer Corti, presented on 23 April 1879 for a Brescia–Gardone Val Trompia tramway, which could later be extended to Tavernole and Bovegno, met with the favor of the Deputation, which granted him the concession. The agreement stipulated that the provincial administration would completely renovate the road between the two localities, while Corti would build the line and put it into operation.
The transfer of the concession from the Milanese engineer to the Tramways à Vapeur de la Province de Brescia accelerated the construction of the line, which was officially inaugurated on 20 February 1882. Service was opened to the public the following day, but was suspended after a few weeks due to damage that autumn rains caused to the bridges over the Mella.
Following these events, in 1883 the provincial administration approved expenditure for improvement of the entire road and for the reconstruction of the Pregno bridge, so that regular service resumed in 1884. During the following years, the main industries of the valley built connections to the tramway. The resulting increase in freight traffic soon saturated the line's capacity, and discussion began on the suitability of a railway that could replace it.
After the second half of the 1880s, at the request of the municipality of Brescia, a horse-drawn tram service was activated on the Porta Trento–Stocchetta section.
Between 1898 and 1900, the Province agreed with the Tramways à Vapeur for the extension of the tramway to Tavernole and its blast furnace. The former committed to renovating the road according to tramway requirements, extending the latter's concession from 1929 to 1932. The project was implemented slowly, because the Belgian company preferred to give priority to the extension to Toscolano of the Riviera tramway. In April 1906 the section to Brozzo was opened, while only on 2 August 1909 the section to Tavernole was opened, after ten years of work. 
In April 1904, a promoter committee for the Brescia–Gardone railway had in fact been formed. SEB had committed to taking over the management of the new railway line with the initial aim of using it for freight transport, while the tram would handle passenger service. Subsequently, the costs related to the maintenance of two parallel lines convinced SEB to plan the dismantling of the tramway.
On 2 August 1907, electric traction was inaugurated on the Brescia–Stocchetta section. The electric motor cars used were two-axle with 42 seats in total.
The railway project in the 1910s became increasingly less concrete, despite the Province having arranged a subsidy of 400,000 Lire. The state's request for 30 percent of gross operating profits convinced SEB to withdraw the concession application.
The electric company therefore committed to electrifying the rest of the line. In January 1913 the electric cars reached Concesio, and on the 31st there was the official communication from the concessionaire for the extension of electric traction to Gardone. SEB also committed to renewing the rolling stock and rails. The new line was inaugurated on 10 November 1913.
On 1 April 1921, the electrified section to Tavernole was inaugurated. Although the province had committed to subsidizing the construction of the Tavernole–Bovegno extension and to improving the road, SEB did not consider the extension economical. The following year, the concession passed from the electric company to its affiliate: the Tramvie Elettriche Bresciane (TEB).
Characteristics
The service was initially operated by Krauss locomotives. With the electrification of the line at 1,200 V direct current, two- or four-axle electric motor cars of unknown manufacturer were employed, which had a power of 45 and 75 horsepower and were equipped with a Westinghouse braking system.
During the electrification process the track was renewed. Vignoles rails of 22 kg/m were laid on the Brescia–Stocchetta section and 23 kg/m on the remaining section.
See also
- History of rail transport in Italy
- List of railway stations in Lombardy
- Brescia–Mantua–Ostiglia Tramway