The Bari–Matera railway (known until 1972 as the Bari–Matera–Montalbano Jonico railway) is an Italian narrow-gauge railway line, operated by Ferrovie Appulo Lucane (FAL).
The southern section between Matera and Montalbano Jonico was closed in 1972; service has been limited to the section between Bari and Matera Sud.
History
At the end of the 19th century, numerous requests were made to the government for the construction of a railway that would break the isolation of Basilicata and the vast area between it, Cilento, and northern Calabria. The construction of the Sicignano–Lagonegro standard-gauge railway raised hopes, and a connection between that locality and Spezzano Albanese was desired, which was finally included in the so-called Zanardelli Law of 1902, but as a narrow-gauge line.
On 23 February 1904, the Special Law for Basilicata was approved in the Chamber of Deputies, which included, among other things, a plan for railway construction, including a narrow-gauge railway from Grumo to Matera, Ferrandina and Pisticci, connecting to the Sicignano–Lagonegro line, with the possible interposition of a third rail between Bari and Grumo Appula. Construction work began only after more than a decade, by the Mediterranea Calabro Lucane, which had secured the concession in 1910, with some variations, including the addition of an initial independent track from Bari to Grumo. The first section, Bari–Matera, was opened in 1915, while the line definitively ended at Montalbano Jonico, thus depriving the line of its southern outlet. The final section between Miglionico and Montalbano was opened in 1932.
The line provided substantial service on the upper section, while service was always modest on the lower section, partly due to the lack of a southern connection. After the transfer to the commissarial government management of the Calabro Lucane Railways, from 1972 the southern section between Ferrandina and Montalbano Jonico was curtailed, closed and replaced by a bus service.
The surface urban crossing of Matera was replaced by an underground route, which was activated on 24 November 1986.
Doubling works
Upon completion of the work, it will be possible to travel the Bari–Matera section in about one hour.
Selective doublings at Venusio and Mellitto are also underway, as well as the undergrounding of the second track at Modugno.
In 2022, work was completed on the undergrounding of the line between Quartierino and Poggiofranco, which, via an underpass, will allow the elimination of level crossings.

New Matera–Ferrandina connection
In August 2022, thanks to funds from the PNRR, RFI recovered the project and launched a tender for €311 million to complete the line. The new railway connection will be a single electrified track, 20 km long from Ferrandina-Scalo Matera station to the new Matera-La Martella stop.
Characteristics
Route
Matera metropolitan railway service
History
In 2012, FAL presented a project to extend the line to the Madonna delle Grazie hospital, with the new station becoming the terminus of the Matera metropolitan railway service with trains every 15 minutes. The project was included in 2021 among those to be financed, with €12 million, through the PNRR, but was subsequently excluded due to the impossibility of meeting the deadline for the publication of tender notices. The funding was diverted to the purchase of five battery trains for €45 million, of which €27 million from PNRR funds and the remainder from PON-PAC 2014–2020 funds.
In December 2023, the Basilicata Region and FAL signed a new service contract, valid from 2024 to 2033, which included 16 train pairs starting from September 2024, in addition to the 18 already present up to Altamura (of which one fast train to Bari). The railway service, called "Metrotranvia dei Sassi" (Sassi tram-train), operates between Matera Sud and Venusio, with a travel time varying between 16 and 19 minutes, with an irregular timetable and small time differences compared to what was provided for in the contract. The inauguration took place on 24 October 2024, almost two months late. From 8 December 2024 to 5 January 2025, the first Sunday service was experimentally introduced, with trains every 30 minutes from 9 am to 10 pm. For the last three Sundays, two additional runs were added between 8 am and 9 am, bringing the total to 29 pairs, almost all terminating at Serra Rifusa rather than Venusio.
In annex 4 of the service contract, it is stipulated that from 2026 trains will also run on holidays and runs will be limited to Serra Rifusa, which, with the activation of the terminal track, will change from a stop to a station. Furthermore, the same annex provides for the introduction of 30-minute headways and the introduction of battery trains starting in 2027.
Future projects
Extensions
In the FAL–Regional service contract, an extension to the Matera hospital was announced, with service starting in 2032.
See also
- History of rail transport in Italy
- Salerno–Reggio di Calabria railway
- Ferrovie Appulo Lucane
- Calabro–Lucanian Railways